• fib Bulletins

    fib Bulletins

  • fib Bulletins

    fib Bulletins

        

Precast tunnel segments in fibre-reinforced concrete (PDF)

No. 83. Precast tunnel segments in fibre-reinforced concrete.
State of the art report (162 pages, ISBN 978-2-88394-123-6, October 2017) - PDF format
Price CHF 120.00
Price CHF 60.00
Price / kg:

Discounts for fib members

Become a member
Description

FIB BULLETIN NO. 83

Title: Precast segmental bridges

Category: Guide to good practice

Year: 2017

Pages: 162

Format approx. DIN A4 (210x297 mm)

ISBN: 978-2-88394-123-6

DOI:doi.org/10.35789/fib.BULL.0083

Abstract:

With the publication of this bulletin, fib Commission 1 is initiating a new series of documents related to the use of structural concrete in underground construction, where structural concrete plays a major and increasingly important role. The usage of underground space is more than ever a key issue of urban planning and fib decided to start addressing the issues related to the design and construction of concrete structures in this particular environment.

In this context one the most significant applications of structural concrete is tunnel lining, for which the properties of reinforced concrete are particularly well suited through compressive strength, water tightness, ductility, and durability. Reinforced concrete tunnels linings have mostly been traditionally cast in situ, but the development of Tunnel Boring Machines has lead to the invention of precast concrete segmental lining technology, which is nowadays one of the most promising applications of Fibre Reinforced Concrete (FRC).

Thanks to the courage and dedication of innovative designers and contractors, a number of large tunnels have already been built around the World with FRC precast linings, and this report presents the experience acquired with these projects, and also provides guidance about the way to apply 2010 fib Model Code recommendations on FRC to these structures.

The main drivers of this evolution from RC to FRC are a better ductility, more durability, and easier fabrication and construction process.

As Commission 1 chair, I am very grateful to Alberto Meda and to all members of this task group for opening the way to this new field of underground structures within our commission, and to have efficiently produced a document that will be useful to our members and to the construction community around the World.

Michel Moussard

Download the copyright page (= list of authors) as a PDF file. 

Download the table of contents as a PDF file.

fib postal address

Ch. du Barrage, Station 18
CH-1015 Lausanne
Switzerland

Contact

p : +41 21 693 27 47
f : +41 21 693 62 45
e : info@fib-international.org
w : www.fib-international.org

Follow fib

Subscribe our newsletter

News

Follow us on
           

Join the fib

Join the fib